Euchner MGB (V2.0.0) Manuel d'utilisateur Page 6

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 14
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 5
MGB Help for Setup and Service
2.2 Teaching in handle module
1. Insert bolt tongue into the evaluation module.
2. Switch on operating voltage UA and UB.
In case of AR configuration: The green LED (State) flashes quickly (approx. 5 Hz).
A self-test is performed during this time (approx. 8 s).
If the red LED (DIA) is illuminated, there is a fault. Teach-in is not possible. The green LED (State)
indicates the fault code. Refer to the “System status table” in the respective system manual for
diagnostics.
3. Activate guard locking (only MGB-L1/MGB-L2).
MGB-L1: no voltage at IMP.
MGB-L2: voltage at IMP.
Teach-in operation starts, green LED (State) flashes (approx. 1 Hz). The teach-in operation is completed
after approx. 60 seconds, the green LED (State) goes out.
4. Switch off operating voltage UB (min. 3 seconds).
The code of the handle module that was just taught in is activated in the evaluation module.
5. Switch on operating voltage UB.
The device operates normally.
Page 6/14 Subject to technical modifications 115218-01-03/12
Vue de la page 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14

Commentaires sur ces manuels

Pas de commentaire